Close Menu
The Vanguard USAThe Vanguard USA
    • Privacy policy
    • Terms of use
    The Vanguard USAThe Vanguard USA
    • Defense
    • Space
    • Deep Tech & AI
    • Industry & Energy
    • About
      • Editorial Policy
      • AI Policy
      • Corrections
      • Privacy
      • Terms
      • Contact
    The Vanguard USAThe Vanguard USA
    Industry & Energy

    Trump says Cleveland will host a new submarine component repair center, but few details are out

    The Vanguard USA DeskBy The Vanguard USA Desk16 October 2026Updated:26 October 20263 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    A Navy machinist uses a lathe to machine a submarine part in a shop at Naval Base Kitsap-Bangor, Washington
    Bangor, Wash., April 2026. Photo: U.S. Navy/Jonathan Estrada-Eguizabal
    Share
    Facebook Twitter LinkedIn Pinterest Email

    President Donald Trump has said Cleveland will be the home of a new U.S. Submarine Component Repair Center, but the site, schedule and number of jobs have not been released. Trump made the announcement at a rally in Youngstown, Ohio, News 5 Cleveland reported, quoting him as saying the Department of War “has officially selected the new home of the U.S. Submarine Component Repair Center.”

    Sen. Jon Husted, R-Ohio, welcomed the announcement in an Oct. 13 press release. He said it followed his letter to Office of Management and Budget Director Russell Vought and Acting Secretary of the Navy Hung Cao urging the administration to consider Northeast Ohio for the facility.

    Husted’s office says the facility is expected to manufacture, repair and maintain submarine components.

    An August memorandum set a 90-day search

    According to Husted, Trump issued a presidential memorandum on Aug. 13 directing administration officials to identify a suitable location for the center within 90 days. News 5 quoted the memorandum as calling for a plan to establish a Component Repair Center “to receive new and refurbish old components and parts as required by the submarine repair industrial base.”

    The memorandum, as quoted by News 5, asked for geographically centralized locations near major road, rail and river transportation networks, and for resources to maintain at least one “ship set” of spare equipment for the Los Angeles, Virginia, Seawolf, Ohio and Columbia submarine classes.

    “Northeast Ohio has the skilled workforce, infrastructure and strategic location to support this critical mission for our U.S. Navy,” Husted said. “This facility will strengthen our national security, support military readiness and create jobs in Cleveland.”

    See also  USS Pinckney begins DDG MOD 2.0 phase two as the first destroyer to get the SPY-6(V)4 radar
    Illustration of a machine shop with a long shaft and valve housings resting on workbenches
    Illustration: The Vanguard USA (AI-generated)

    Cleveland says it has no details to share

    The City of Cleveland told News 5 on Oct. 13 that “there are no specific details to share at this time,” adding that it “would welcome and support the Navy’s interest in development opportunities in Cleveland.”

    Trump described the center as a “massive 46,000-square-foot facility,” according to News 5, which said it asked the White House to clarify that figure and did not hear back. No number of jobs has been released.

    The selection lands as the Navy works to expand submarine maintenance capacity elsewhere, including at Pearl Harbor, where Dry Dock 5, the first built for the Navy’s newest submarines, is nearing dewatering.

    Bartlett Maritime has pitched a repair center in Lorain

    News 5 reported that Bartlett Maritime, a local company that has worked with the Navy since 2024 to train Northeast Ohio workers for rotational shipyard repair work, has for years pushed for a component repair facility in Lorain. Under its earlier plans, as described by News 5, finished parts would go to a kitting facility in Lordstown before being shipped to shipyards ahead of a submarine’s arrival.

    It is not clear whether the Cleveland center is connected to that proposal. Bartlett deferred questions to the White House, telling News 5 only that “a Component Repair Center will add desperately needed capacity to America’s submarine industrial base, and that Northeast Ohio is exactly the right place to operate a CRC.” Lorain Mayor Jack Bradley told News 5 he had not heard from Washington.

    Related coverage: Navy adds a $2.41 billion ceiling to Fluor’s naval reactor lab contract with $597,900 obligated

    See also  Idaho National Laboratory leads ARPA-E's project to irradiate first molten plutonium chloride fuel
    Bartlett Maritime Cleveland Jon Husted Submarine industrial base U.S. Navy
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleOndas and Palantir launch Regna AI to build mission models that governments control
    Next Article F-22 Raptor pilot directs Anduril’s YFQ-44A Collaborative Combat Aircraft in flight
    The Vanguard USA Desk

    The Vanguard USA Desk is the editorial team of The Vanguard USA, published by EDGENICHE. It reports on U.S. defense technology, space, deep tech and AI, and the industrial base and energy systems behind them.

    Related Posts

    Industry & Energy

    NRC pushes its review of Orano’s Project Ike uranium enrichment plant in Oak Ridge to June 2027, Nuclear News reports

    14 November 2026
    Industry & Energy

    ARPA-E selects eight superhot geothermal projects, including Oak Ridge and Los Alamos labs, for up to $30 million

    13 November 2026
    Industry & Energy

    Tanker Dominica Prosperity struck by a projectile off the UAE as attacks on Gulf shipping continue

    13 November 2026
    Top stories

    NRC pushes its review of Orano’s Project Ike uranium enrichment plant in Oak Ridge to June 2027, Nuclear News reports

    14 November 2026

    Office of Space Commerce picks Starcloud, Portal, Cowboy Space and Redwire’s SpaceMD for its certification pilot

    14 November 2026

    Commerce Department finalizes a CHIPS Act R&D award of up to $100 million to quantum computing firm Atom Computing

    14 November 2026

    SpaceX catches Starship’s Ship 42 with its launch tower after 14 orbits on Flight 15, a first for an orbital upper stage

    14 November 2026
    © 2026 The Vanguard USA

    Type above and press Enter to search. Press Esc to cancel.